@@ -1926,6 +1926,11 @@ extern long sched_getaffinity(pid_t pid, struct cpumask *mask);
#define TASK_SIZE_OF(tsk) TASK_SIZE
#endif
+#ifdef CONFIG_SMP
+/* Returns effective CPU energy utilization, as seen by the scheduler */
+unsigned long sched_cpu_util(int cpu, unsigned long max);
+#endif /* CONFIG_SMP */
+
#ifdef CONFIG_RSEQ
/*
@@ -5138,8 +5138,8 @@ struct task_struct *idle_task(int cpu)
* based on the task model parameters and gives the minimal utilization
* required to meet deadlines.
*/
-unsigned long schedutil_cpu_util(int cpu, unsigned long util_cfs,
- unsigned long max, enum schedutil_type type,
+unsigned long effective_cpu_util(int cpu, unsigned long util_cfs,
+ unsigned long max, enum cpu_util_type type,
struct task_struct *p)
{
unsigned long dl_util, util, irq;
@@ -5223,6 +5223,12 @@ unsigned long schedutil_cpu_util(int cpu, unsigned long util_cfs,
return min(max, util);
}
+
+unsigned long sched_cpu_util(int cpu, unsigned long max)
+{
+ return effective_cpu_util(cpu, cpu_util_cfs(cpu_rq(cpu)), max,
+ ENERGY_UTIL, NULL);
+}
#endif /* CONFIG_SMP */
/**
@@ -178,7 +178,7 @@ static unsigned long sugov_get_util(struct sugov_cpu *sg_cpu)
sg_cpu->max = max;
sg_cpu->bw_dl = cpu_bw_dl(rq);
- return schedutil_cpu_util(sg_cpu->cpu, util, max, FREQUENCY_UTIL, NULL);
+ return effective_cpu_util(sg_cpu->cpu, util, max, FREQUENCY_UTIL, NULL);
}
/**
@@ -6499,7 +6499,7 @@ compute_energy(struct task_struct *p, int dst_cpu, struct perf_domain *pd)
* is already enough to scale the EM reported power
* consumption at the (eventually clamped) cpu_capacity.
*/
- sum_util += schedutil_cpu_util(cpu, util_cfs, cpu_cap,
+ sum_util += effective_cpu_util(cpu, util_cfs, cpu_cap,
ENERGY_UTIL, NULL);
/*
@@ -6509,7 +6509,7 @@ compute_energy(struct task_struct *p, int dst_cpu, struct perf_domain *pd)
* NOTE: in case RT tasks are running, by default the
* FREQUENCY_UTIL's utilization can be max OPP.
*/
- cpu_util = schedutil_cpu_util(cpu, util_cfs, cpu_cap,
+ cpu_util = effective_cpu_util(cpu, util_cfs, cpu_cap,
FREQUENCY_UTIL, tsk);
max_util = max(max_util, cpu_util);
}
@@ -6607,7 +6607,7 @@ static int find_energy_efficient_cpu(struct task_struct *p, int prev_cpu)
* IOW, placing the task there would make the CPU
* overutilized. Take uclamp into account to see how
* much capacity we can get out of the CPU; this is
- * aligned with schedutil_cpu_util().
+ * aligned with sched_cpu_util().
*/
util = uclamp_rq_util_with(cpu_rq(cpu), util, p);
if (!fits_capacity(util, cpu_cap))
@@ -2486,22 +2486,22 @@ static inline unsigned long capacity_orig_of(int cpu)
}
/**
- * enum schedutil_type - CPU utilization type
+ * enum cpu_util_type - CPU utilization type
* @FREQUENCY_UTIL: Utilization used to select frequency
* @ENERGY_UTIL: Utilization used during energy calculation
*
* The utilization signals of all scheduling classes (CFS/RT/DL) and IRQ time
* need to be aggregated differently depending on the usage made of them. This
- * enum is used within schedutil_freq_util() to differentiate the types of
+ * enum is used within effective_cpu_util() to differentiate the types of
* utilization expected by the callers, and adjust the aggregation accordingly.
*/
-enum schedutil_type {
+enum cpu_util_type {
FREQUENCY_UTIL,
ENERGY_UTIL,
};
-unsigned long schedutil_cpu_util(int cpu, unsigned long util_cfs,
- unsigned long max, enum schedutil_type type,
+unsigned long effective_cpu_util(int cpu, unsigned long util_cfs,
+ unsigned long max, enum cpu_util_type type,
struct task_struct *p);
static inline unsigned long cpu_bw_dl(struct rq *rq)