@@ -5985,6 +5985,32 @@ static int cpu_util(int cpu)
return (util >= capacity) ? capacity : util;
}
+/**
+ * cpu_util_est: estimated utilization for the specified CPU
+ * @cpu: the CPU to get the estimated utilization for
+ *
+ * The estimated utilization of a CPU is defined to be the maximum between its
+ * PELT's utilization and the sum of the estimated utilization of the tasks
+ * currently RUNNABLE on that CPU.
+ *
+ * This allows to properly represent the expected utilization of a CPU which
+ * has just got a big task running since a long sleep period. At the same time
+ * however it preserves the benefits of the "blocked load" in describing the
+ * potential for other tasks waking up on the same CPU.
+ *
+ * Return: the estimated utlization for the specified CPU
+ */
+static inline unsigned long cpu_util_est(int cpu)
+{
+ struct sched_avg *sa = &cpu_rq(cpu)->cfs.avg;
+ unsigned long util = cpu_util(cpu);
+
+ if (!sched_feat(UTIL_EST))
+ return util;
+
+ return max(util, util_est(sa, UTIL_EST_LAST));
+}
+
static inline int task_util(struct task_struct *p)
{
return p->se.avg.util_avg;
@@ -6007,11 +6033,19 @@ static int cpu_util_wake(int cpu, struct task_struct *p)
/* Task has no contribution or is new */
if (cpu != task_cpu(p) || !p->se.avg.last_update_time)
- return cpu_util(cpu);
+ return cpu_util_est(cpu);
capacity = capacity_orig_of(cpu);
util = max_t(long, cpu_rq(cpu)->cfs.avg.util_avg - task_util(p), 0);
+ /*
+ * Estimated utilization tracks only tasks already enqueued, but still
+ * sometimes can return a bigger value than PELT, for example when the
+ * blocked load is negligible wrt the estimated utilization of the
+ * already enqueued tasks.
+ */
+ util = max_t(long, util, cpu_util_est(cpu));
+
return (util >= capacity) ? capacity : util;
}
@@ -7539,7 +7573,7 @@ static inline void update_sg_lb_stats(struct lb_env *env,
load = source_load(i, load_idx);
sgs->group_load += load;
- sgs->group_util += cpu_util(i);
+ sgs->group_util += cpu_util_est(i);
sgs->sum_nr_running += rq->cfs.h_nr_running;
nr_running = rq->nr_running;
@@ -81,3 +81,7 @@ SCHED_FEAT(RT_RUNTIME_SHARE, true)
SCHED_FEAT(LB_MIN, false)
SCHED_FEAT(ATTACH_AGE_LOAD, true)
+/*
+ * UtilEstimation. Use estimated CPU utiliation.
+ */
+SCHED_FEAT(UTIL_EST, false)
When the scheduler looks at the CPU utlization, the current PELT value for a CPU is returned straight away. In certain scenarios this can have undesired side effects on task placement. For example, since the task utilization is decayed at wakeup time, when a long sleeping big task is enqueued it does not add immediately a significant contribution to the target CPU. As a result we generate a race condition where other tasks can be placed on the same CPU which is still considered relatively empty. In order to reduce these kind of race conditions, this patch introduces the required support to integrate the usage of the CPU's estimated utilization in some load balancer path. The estimated utilization of a CPU is defined to be the maximum between its PELT's utilization and the sum of the estimated utilization of the tasks currently RUNNABLE on that CPU. This allows to properly represent the expected utilization of a CPU which, for example it has just got a big task running since a long sleep period. Signed-off-by: Patrick Bellasi <patrick.bellasi@arm.com> Cc: Ingo Molnar <mingo@redhat.com> Cc: Peter Zijlstra <peterz@infradead.org> Cc: Paul Turner <pjt@google.com> Cc: Vincent Guittot <vincent.guittot@linaro.org> Cc: Morten Rasmussen <morten.rasmussen@arm.com> Cc: Rafael J. Wysocki <rafael.j.wysocki@intel.com> Cc: linux-kernel@vger.kernel.org Cc: linux-pm@vger.kernel.org --- kernel/sched/fair.c | 38 ++++++++++++++++++++++++++++++++++++-- kernel/sched/features.h | 4 ++++ 2 files changed, 40 insertions(+), 2 deletions(-) -- 2.14.1